I. Company Profile
Datang Jiangsu Power Generation Co., Ltd. (formerly Jiangsu Branch of China Datang Corporation), established in December 2006, is a wholly-owned subsidiary of China Datang Corporation, engaged in the development, investment, construction, operation and management of power energy and heat networks. In December 2016, the company completed regional integration reform. Currently, the company has an installed controllable capacity of 6,094.3 MW in operation, an annual power generation of 30 billion kWh, an output value of over RMB 9.2 billion, and profits and taxes of RMB 2.5 billion.
The company's subsidiaries include Datang International Lvsigang Power Generation Co., Ltd. with 4×660 MW units, Datang Nanjing Power Plant with 2×660 MW units, and Jiangsu Xutang Power Generation Co., Ltd. with 4×300 MW units, all of which are large-scale thermal power enterprises at the million-kilowatt level. Among them, Lvsigang Power Plant is located in the load center of the "Yangtze River Delta" and is a veritable "offshore power plant" facing the Yellow Sea to the east; Datang Nanjing Power Plant, formerly Jinling Electric Light Official Factory, was founded in 1910 and is China's first government-run power plant. In September 2014 and April 2015, the plant took the lead in successfully implementing the "ultra-low emission" transformation of flue gas pollutants for two 660 MW units, becoming the first power plant in China Datang Corporation and Nanjing to fully complete "ultra-low emission"; Jiangsu Xutang Power Generation Co., Ltd. has been awarded the "National May 1 Labor Certificate", "National Model Workers' Home", and its Phase I technical transformation project won the "China Construction Engineering Luban Prize", and it took the lead in innovatively implementing the "three major fuel projects" nationwide. Datang Suzhou Thermal Power Co., Ltd. under its jurisdiction has 2×200 MW gas turbine cogeneration units and was awarded the title of "China Beautiful Power Plant" in 2013. Datang Dafeng Photovoltaic Power Generation Co., Ltd. under its jurisdiction is a 5.8 MW rooftop photovoltaic power generation project, which was the largest rooftop photovoltaic power station in Jiangsu Province at the time of commissioning at the end of 2010. Among the projects under construction, the Datang Jiangyan 2×200 MW gas turbine cogeneration project, Datang Dafeng Wind Power Project, Rugao Back-pressure Turbine Heating Project, and Guanyun Agricultural-Photovoltaic Complementary Project were put into operation in 2017, and the Jintan 4×400 MW-class gas cogeneration project was put into operation in 2018. At the same time, it manages multiple preparatory offices including East China New Energy Company and New Energy Project Preparatory Office, and a number of thermal power, gas turbine, wind power, natural gas and other projects are carrying out preliminary work.
Datang Jiangsu Power Generation Co., Ltd., centering on the goal of boosting Jiangsu Province's economic development, has always firmly practiced the core concept of "value thinking, benefit orientation". All cadres and employees vigorously carry forward the Datang spirit of "pragmatism, dedication, innovation, and forging ahead", are brave in innovation, actively practice, and are committed to building the "Datang Su Dian" brand. The company warmly welcomes outstanding fresh graduates to join our team and jointly compose a better tomorrow for Datang Jiangsu Power Generation Co., Ltd.
II. Recruitment Target
Undergraduate and above graduates of 2018 from ordinary higher education institutions within the national unified recruitment plan.
III. Recruitment Conditions
1. Good conduct, law-abiding and disciplined, diligent and studious, honest and trustworthy, solid professional foundation, and a strong spirit of unity and cooperation;
2. Good health, passing the physical examination, and no diseases hindering work in the power industry;
3. Major matching, and must obtain a graduation certificate and degree certificate upon graduation; in principle, should obtain a National Computer Rank Examination Level 2 or above certificate, and a score of 425 or above in the National College English Test Band 4 (Band 6).
Congratulations, submitted successfully!
Your edit is under review. You will be notified by email within 1 business day.
Submission failed.
Help others learn about this company, add my impression of this company»
Log in with the following accounts to save your follows