I. Introduction to Zhongmei Xinji Lixin Power Generation Co., Ltd.
1. Company Overview
Zhongmei Xinji Lixin Power Generation Co., Ltd. was established in December 2008. It is controlled by Zhongmei Xinji Energy Co., Ltd., with Anhui Waneng Co., Ltd. as a participating shareholder. The shareholding ratios of the two parties are 55% and 45%, respectively, and the company operates as an independent legal entity.
2. Remarkable Achievements in Project Construction
The company's (2×1000) coal-electricity integration project has won the Gold Prize of the National Quality Project Award, marking the first time this award has been granted to a million-kilowatt coal-electricity integration project in China.
The project has successively received the Excellent Quality Project Award of the Electric Power Industry, the First Prize of the Excellent Engineering Design Award of the Electric Power Industry, and the China Installation Quality Project Award. The project has won over 130 awards at the provincial and ministerial levels or above, including 17 Science and Technology Progress Awards for Electric Power Construction, 27 Achievement Awards, 19 Construction Methods, 14 National Invention Patents, 34 Utility Model Patents, and 20 other provincial and ministerial awards. The unit performance indicators are excellent, with major indicators such as standard coal consumption for power generation and boiler efficiency reaching an advanced level.
3. Outstanding Safety Production Performance
The company has always adhered to the philosophy of "zero risk exposure, zero injuries, zero accidents, and zero pollution", firmly establishing a red-line awareness and bottom-line thinking, and insisting on intrinsic safety. Since the commissioning of the two units, equipment has remained healthy, operations have been stable, and no safety or equipment accidents have occurred. The company has achieved over 900 days without unplanned outages, with Unit #1 achieving 1,100 days without unplanned outages, both breaking national records for million-kilowatt-class units.
4. Significant Benefits from Scientific Management
The company has consistently focused on core tasks such as production, operation, and internal control, scientifically organizing production, striving for management improvement, and aiming for optimal benefits. As of the end of 2022, the company has cumulatively completed power generation of 64.637 billion kWh, achieving cumulative profits of 2.788 billion yuan, and has yielded tremendous economic and social benefits.
5. Overview of the Phase II Project
The company's Phase II project has been included in Anhui Province's "14th Five-Year Plan" Energy Plan. It involves the construction of two 660,000 kW ultra-supercritical generating units, which complies with the national industrial policy of coal-electricity joint operation. The project actively implements the State Council's "Guiding Opinions on Actively Promoting the 'Internet+' Action" and the "Guiding Opinions on Promoting the Development of 'Internet+' Smart Energy" issued by the National Development and Reform Commission, the National Energy Administration, and the Ministry of Industry and Information Technology. Adhering to technological innovation, the project aims to build a world-leading new-type smart power plant. After commissioning, the project will further support the consumption of regional new energy power, drive economic growth, promote circular industries, and facilitate regional development.
With the goals of "creating a first-class power enterprise, achieving optimal economic benefits, fostering a harmonious and motivated team, and providing a good life for employees," the company strives to offer employees a platform for noble careers and a guarantee of a decent life. We look forward to your participation and efforts in building a brilliant tomorrow for the company. We firmly believe that your life ideals will be realized in the company's vigorous development. With your addition, the company's tomorrow will be even brighter, and the company's brilliant future will surely fulfill your beautiful life!
Zhongmei Xinji Lixin Power Generation Co., Ltd., currently in development, looks forward to your joining!
II. Recruitment Principles
1. Recruit broadly for talent, emphasizing both integrity and ability.
2. Uphold fairness, justice, competition, and merit-based selection.
3. Emphasize lean efficiency, multi-tasking, and versatility.
III. Recent Recruitment Positions and Requirements
According to work needs, we are recruiting production and business backbone personnel from the national power industry.
IV. Compensation and Benefits
Salaries for recruited personnel will be implemented in accordance with the company's wage management regulations; corresponding salary levels will be determined based on the position held, and all statutory social insurances will be provided.
V. Application Methods
1. Please submit application materials online via our website.
2. Personal application materials (electronic version):
(1) "Application Form of Zhongmei Xinji Lixin Power Generation Co., Ltd." (submitted online);
(2) Certificates proving current employment and position;
(3) Scanned copies of academic degree certificates and the Ministry of Education's online verification report for academic credentials;
(4) Professional title certificates, skill certification certificates, etc.
3. Interview time will be notified separately.
4. Contact Information
Mailing Address: Banji Power Plant, Huji Town, Lixin County, Bozhou City, Anhui Province
Contact Person: ***
Tel: 0558—8787356, 8787357
Postal Code: 236700
Congratulations, submitted successfully!
Your edit is under review. You will be notified by email within 1 business day.
Submission failed.
Help others learn about this company, add my impression of this company»
Log in with the following accounts to save your follows