Pharmaron Shaoxing was established in 2017 and serves as Pharmaron's small molecule API manufacturing base, covering an area of 250 mu, with Phase I occupying approximately 170 mu and a building area of over 80,000 square meters. It includes three multi-purpose and commercial production workshops, is equipped with advanced production equipment, and has a production capacity of approximately 650 cubic meters of reactors, providing API and advanced intermediate production services. Phase I completed all acceptance inspections in February 2022 and was officially put into operation for production tasks. The construction of five workshops in Phase II is progressing smoothly; by the end of 2025, two newly built workshops had been put into operation, and the other three workshops will be put into operation before the end of 2026. Upon completion, the reactor production capacity will reach more than 1,500 cubic meters. Currently, there are more than 1,000 employees in total, and in the future it will be able to achieve API
What does Pharmaron (Shaoxing) Pharmaceutical Co., Ltd. require? Who is Pharmaron (Shaoxing) Pharmaceutical Co., Ltd. hiring? recruitment: 工厂生产类占比最多占48.4%,其次是技工类占35.5%. What education can get in at ? 本科占比最多占61.3%,其次是大专占22.6%. High education required at ? 硕士占3.2%. Work experience required at ? 不限占比最多占93.5%,其次是1-3年占6.5%. Where are the job locations at ? 绍兴占比最多占93.5%,其次是杭州占6.5%. Based on job postings from the past year, for reference only.
Congratulations, submitted successfully!
Your edit is under review. You will be notified by email within 1 business day.
Submission failed.
Help others learn about this company, add my impression of this company»
Log in with the following accounts to save your follows