Discover Great Companies Discover Great Clients
Popularity  12.5万   |   Followers  362   |   Likes  42   |   Feedback  217 Claim this company
No.231 Haishu District Popularity Ranking Ningbo City Zhejiang P No.8 Greening Engineering No.9 Transportation Engineering No.9 Industrial Construction No.14 Landscaping Greening No.35 Municipal No.41 Power Distribution Track Road Transportation Construction Transportation Engineering Design Che Liang Duan Gong Cheng Che Liang Engineering Vehicles 国家优质工程奖
More

Company Overview

  • Nature: State-Owned Enterprise Size: Unknown Founded: 20年
  • Industry: Machinery/Equipment/Heavy Industry 、 Aerospace/Aviation 、 Raw Materials and Processing 、 Construction/Building Materials/Engineering
  • Full name: Ningbo Rail Transit Group Co., Ltd.。

Development Stage

  • Ranking: Ranked #8 in Ningbo Greening Engineering Company by popularity Ranked #9 in Ningbo Transportation Engineering Company by popularity Ranked #9 in Ningbo Industrial Construction Company by popularity
  • Honors: 2022中国交通500强 国家优质工程奖 According to algorithm

About the Company

The first phase of Ningbo Rail Transit Line 1 starts from Gaoqiao Town in the west, runs eastward along the planned green belt between Wangchun Road and Houtang River as an elevated line, passes Lugang and Xujiacao, then turns underground to the west of Airport Road, continues eastward along Zhongshan West Road, passing the West Bus Station, Daqing Bridge, Ximenkou, Gulou, City Hall, and Tianyi Square. After crossing the Fenghua River, it runs eastward along Zhongshan East Road, passing Cherry Blossom Park and Century Avenue, then turns into Ningchuan Highway eastward, passing Haiyan Road and Shengmo Road to the East Outer Ring Road Station. The project line is 20.878 kilometers long, including 5.63 kilometers of elevated line, 15.32 kilometers of underground line, and 0.35 kilometers of transition section, with a total of 20 stations, including 5 elevated stations and 15 underground stations, with an average station spacing of 1,082 meters. The first phase of Ningbo Rail Transit Line 1 includes one vehicle depot comprehensive base and one parking lot. Among them, Tiantongzhuang vehicle base undertakes the factory and overhaul tasks for vehicles of Lines 1, 2, and 3, and together with Shilutou parking lot, it undertakes the parking, daily inspection, exterior cleaning, and disinfection tasks for assigned vehicles, as well as the periodic repair and monthly inspection tasks for assigned vehicles. Two main substations are set up at Wangchun Road and Cherry Blossom Park. The first phase of Ningbo Rail Transit Line 1 adopts a mixed operation mode of large and small routing. The engineering vehicles are selected as Type B vehicles, with 6-car formation in the initial, near-term, and long-term periods, 4 motor cars and 2 trailers, with a maximum operating speed of 80 kilometers per hour. The initial vehicle allocation is 23 trains (138 vehicles). The first phase of Ningbo Rail Transit Line 1 started full construction in June 2009, with a construction period of 5 years, and opened for trial operation by 2014.

Expand
Information is aggregated from the web and may not be exact. For reference only.
Information incorrect? Claim this company to edit

Products & Services (1 in total)

0 reviews
宁波市轨道交通集团官方应用——提供地铁出行指南,引领甬城生活方式。主要功能如下:【到站信息】提供每站首末班车时刻、按列车运行计划提供列车到站时间查询。【出行指引】通过选择起点...
Manage

Recruitment Overview / Current Status (3 open positions)

Manage
Note: How fast is hiring at Ningbo Rail Transit Group Co., Ltd. growing? . A rising curve may indicate expansion; a falling curve may indicate slower growth or good retention. Based on publicly available data, for reference only.

This company — Fortune 500? (More)

Yes, ranked in 中国交通500强:

  • NO.498 2022中国交通500强 >

honors, qualifications & industry associations

Tags are labelled based on keyword text matching analysis and may be related to the company. For reference only.

Business Registration

Provided by

Operating Status: 开业
Registered Capital: 2,015,000万(元)
Legal Representative: 姚晔
Date Established:
Credit Code: 913302007960219655
Registered Address: 浙江省宁波市鄞州区邱隘镇青莲路528号

Partners & Suppliers

城市轨道交通工程设计及咨询服务 Source
供应商 城市轨道交通建设运营单位
作为业主方,将轨道交通工程(如宁波市轨道交通7号线、8号线一期土建工程)发包给宏润建设施工 Source
供应商 轨道交通建设客户
宁波地铁7号线土建工程发包方,2021年前五大客户之一。 Source
供应商 轨道交通建设
宁波地铁3号线二期信号系统建设项目合作 Source
供应商 城市轨道交通信号系统
采购公司电缆用于地铁建设 Source
供应商 轨道交通客户

People who follow this company also follow

Competitors (Similar Companies)

汽车营销 进出口/国际贸易 货运 仓储
“婴儿保育设备专业制造商”
风险管理 信贷 金融 资产管理
机械制造/生产/加工 输送机 机械设备/装备 关风机
苯乙烯 聚乙烯/PE 乙酸丁酯 乙酸
石墨 石墨制品 分子筛 密封件
抽水蓄能 发电设备 水利 电力设备
模具制作 压铸 铰链 门锁
软管 汽车工业 生产 制造
国际物流/运输 报关 货运 货运代理
自动化 传感器 智能硬件 继电器
电气 传感器 动车组 站台屏蔽门
“纺织化学品和有机硅新材料”
电子厂/电子 电池 光学 太阳能电池
电气 工业自动化 电机系统 自动化

Discover Great Companies, Discover Great Clients

宁波公司名录 宁波“Haishu District”公司名录 宁波“交通工程”公司名录 宁波“园林绿化”公司名录 宁波“配电”公司名录 宁波“绿化工程”公司名录 宁波“市政”公司名录 附近的公司

Report

*Reason:

Radical political or ideological topics
Advertising or spam
Pornographic or vulgar content
Obscene language or personal attacks
Other

Congratulations, submitted successfully!

Your edit is under review. You will be notified by email within 1 business day.

Submission failed.

Followed successfully. We'll notify you of any company updates.

Help others learn about this company, add my impression of this company»

Log in with the following accounts to save your follows

Followed successfully, we'll notify you of any company updates