Guodian Zhejiang Beilun* Power Generation Co., Ltd. is located in Beilun District, Ningbo City, Zhejiang Province, adjacent to the * Development Zone—Ningbo Economic and Technological Development Zone, facing Jintang Island of Zhoushan City across the sea to the north, close to Jingang West Road of Beilun District to the south, about 3 kilometers from the TongSan Expressway, adjacent to the Beilun Port container terminal and the 300,000-ton oil terminal on the east and west sides respectively, and about 30 kilometers from the urban area of Ningbo City to the southwest.
Beilun Power Plant was established on August 4, 1989, originally named Beilun Port Power Plant. It is the * thermal power plant in China constructed using World Bank loans. In March 1994, it was renamed Zhejiang Beilun Power Plant. The project was constructed in two phases. Phase I, with 2×600MW subcritical coal-fired units, was completed and put into operation in November 1994. Phase II, with 3×600MW subcritical coal-fired units, was completed and put into operation in September 2000. After the implementation of "separation of plant and grid" in 2003, Phase I was controlled by China Guodian Corporation and renamed Guodian Zhejiang Beilun* Power Generation Co., Ltd. in July 2004. Phase II established the owner company—Zhejiang Beilun Power Generation Co., Ltd.—in 1997, and is currently controlled by Zhejiang Provincial Energy Group Co., Ltd. The operation and maintenance management of Phase II units is entrusted to Guodian Zhejiang Beilun* Power Generation Co., Ltd.
At present, the Phase III 2×1000MW ultra-supercritical coal-fired unit expansion project of the power plant was approved by the National Development and Reform Commission in July 2006. China Guodian Corporation holds 50% of the shares. It is planned to be completed and put into operation in 2009.
Since Beilun Power Plant was put into operation, its main economic and technical indicators, such as power supply coal consumption, auxiliary power consumption rate, equivalent availability factor of equipment, and overall labor productivity, have been at the leading level among similar power plants in China. The enterprise has passed the "three-in-one" certification of the ISO14001 environmental management system, GB/T28001 occupational safety and health management system, and ISO9001 quality management system. Its archives management and measurement management have reached the national first-class standard. In 1998, the enterprise was awarded the title of First-class Thermal Power Plant and Double Civilization Unit by the former National Electric Power Corporation; in 1999, it was awarded Zhejiang Provincial Civilization Unit; in 2002, it was awarded the National "May 1st" Labor Certificate and was among the first batch granted the title of "International First-class Thermal Power Plant" by the former National Electric Power Corporation; in 2003, it was awarded the National Model Workers' Home; in 2004, it was awarded Advanced Unit in Chinese Enterprise Culture Construction and Excellent Enterprise in the National Power Industry; in 2005, it was awarded the National Power Industry Quality Management Award and National Advanced Unit in Spiritual Civilization Construction; in 2006, it was awarded a four-star power generation enterprise by Guodian Group, and the company's Party Committee was awarded the title of Advanced Grassroots Party Organization of Central Enterprises by the SASAC.
Congratulations, submitted successfully!
Your edit is under review. You will be notified by email within 1 business day.
Submission failed.
Help others learn about this company, add my impression of this company»
Log in with the following accounts to save your follows